Hebei Xinnuo Roll forming Machine Co..td
helen@hbxinnuorollforming.com
Home Products Double Layer Roll Forming Machine IBR+IBR Double Layer Roll Forming Machine Double Layer IBR Trapezoidal Profile and Corrugated Wave Pattern Roof Sheeting Roll Forming Machine for Sale with Automatic PLC Control Hydraulic Post Cutting System Metal Galvanized Steel Coil Cold Roll Former Production Line Equipment for Building

Products

Double Layer IBR Trapezoidal Profile and Corrugated Wave Pattern Roof Sheeting Roll Forming Machine for Sale with Automatic PLC Control Hydraulic Post Cutting System Metal Galvanized Steel Coil Cold Roll Former Production Line Equipment for Building
Double Layer IBR Trapezoidal Profile and Corrugated Wave Pattern Roof Sheeting Roll Forming Machine for Sale with Automatic PLC Control Hydraulic Post Cutting System Metal Galvanized Steel Coil Cold Roll Former Production Line Equipment for Building Double Layer IBR Trapezoidal Profile and Corrugated Wave Pattern Roof Sheeting Roll Forming Machine for Sale with Automatic PLC Control Hydraulic Post Cutting System Metal Galvanized Steel Coil Cold Roll Former Production Line Equipment for Building Double Layer IBR Trapezoidal Profile and Corrugated Wave Pattern Roof Sheeting Roll Forming Machine for Sale with Automatic PLC Control Hydraulic Post Cutting System Metal Galvanized Steel Coil Cold Roll Former Production Line Equipment for Building Double Layer IBR Trapezoidal Profile and Corrugated Wave Pattern Roof Sheeting Roll Forming Machine for Sale with Automatic PLC Control Hydraulic Post Cutting System Metal Galvanized Steel Coil Cold Roll Former Production Line Equipment for Building Double Layer IBR Trapezoidal Profile and Corrugated Wave Pattern Roof Sheeting Roll Forming Machine for Sale with Automatic PLC Control Hydraulic Post Cutting System Metal Galvanized Steel Coil Cold Roll Former Production Line Equipment for Building

Double Layer IBR Trapezoidal Profile and Corrugated Wave Pattern Roof Sheeting Roll Forming Machine for Sale with Automatic PLC Control Hydraulic Post Cutting System Metal Galvanized Steel Coil Cold Roll Former Production Line Equipment for Building

Product ID : Clombia ibr + ibr
Product Attributes :

- Complete IBR and corrugated sheeting production line ready for immediate factory deployment

- Two fully independent roller carriages housed in one 350H welded steel main frame

- IBR trapezoidal roof sheets spanning 686 mm to 1050 mm effective coverage width

- Corrugated wave sheeting covering 665 mm to 990 mm effective coverage width

- 5 to 15 minute profile switch via mechanical diverter guide without roller removal

- Each machine undergoes full-load test run with customer-specified coil before packing

- Comprehensive 12-month warranty with remote diagnostics and spare parts support

Product Description

Double Layer IBR and Corrugated Roof Sheeting Machine for Sale — What You Actually Receive When You Place an Order

Buying a roll forming machine is a significant capital decision, and understanding exactly what arrives at your factory gate — and what it takes to go from unboxing to full-capacity production — is critical to making an informed purchase. This double layer IBR and corrugated roof sheeting machine for sale is a complete, factory-tested, container-ready production line that produces the two highest-demand metal roofing profiles from a single machine footprint. Below is a transparent breakdown of what the purchase includes, how the machine is built and tested, what preparation your facility requires, and what ongoing support you receive after delivery.

What the Purchase Package Includes — Complete Component Breakdown

# Included Item Quantity Description and Specification
1 Main Double Layer Forming Machine Body 1 unit 350H/400H H-steel welded frame housing both IBR and corrugated roller carriages; includes diverter assembly, drive system, and protective guards
2 Hydraulic Decoiler / Uncoiler 1 unit 5-ton or 8-ton load capacity; expanding mandrel type; manual, pneumatic, or hydraulic mandrel expansion per selection
3 PLC Control Cabinet with HMI 1 unit Industrial-grade PLC; 7-inch color touchscreen; preloaded with IBR and corrugated production recipes; multi-language interface
4 Hydraulic Power Station 1 unit 4.0 kW motor, gear pump, 60-80 L oil reservoir, pressure gauge, relief valve, air-cooled radiator, hydraulic hoses with quick-connect fittings
5 Run-Out Roller Conveyor Table 1 unit 3-meter or 4-meter powered roller conveyor with side alignment rails; height-adjustable support legs
6 Spare Shear Blade Set 1 set (2 pcs) Upper and lower Cr12MoV blades, HRC 60-62, identical to factory-installed blades; individually wrapped in anti-corrosion paper
7 Standard Maintenance Toolkit 1 kit Combination wrenches (8-32 mm), hex key set, adjustable wrench, grease gun with lithium grease cartridge, feeler gauge set, steel ruler, spirit level
8 Printed Documentation Package 1 set Installation manual (English), operation manual, maintenance schedule chart, electrical wiring schematic (A2 size), hydraulic circuit diagram (A2 size), foundation bolt layout drawing
9 Digital Documentation USB Drive 1 unit All printed documents in PDF format; step-by-step commissioning video (approx. 45 minutes); PLC parameter backup files; spare parts catalog with part numbers; machine general arrangement CAD drawing
10 Foundation Anchor Bolts 1 set High-tensile steel anchor bolts with nuts and washers; quantity and size matched to machine frame bolt-hole pattern
11 Anti-Rust Protective Coating Applied to all machined surfaces All roller surfaces, shaft ends, chain and sprocket assemblies, shear blade edges, and exposed machined surfaces coated with removable anti-corrosion grease before container packing
12 Fumigated Wooden Crating As required ISPM-15 compliant fumigated solid wood crates and pallets; moisture-barrier plastic wrapping inside crates; steel banding for container securing

Factory Acceptance Testing — Quality Verification Before Your Machine Leaves the Workshop

Every double layer IBR and corrugated roof sheeting machine manufactured for sale undergoes a systematic pre-delivery inspection and test protocol. This is not a spot-check on a sample unit — it is a full functional test performed on the exact machine that will be packed into your container. The testing sequence is as follows:

Stage Inspection Item What Is Checked Acceptance Standard
1 Frame Dimensional Verification Laser measurement of wall plate parallelism, bearing seat bore alignment, frame diagonal squareness, base flatness Parallelism deviation ≤ 0.10 mm/m; diagonal difference ≤ 1.0 mm; base flatness ≤ 0.50 mm/m²
2 Roller Contour Inspection Each roller measured against its CAD profile template using profile projector or CMM; chrome thickness verified with coating gauge Profile deviation ≤ 0.05 mm at any point; chrome layer thickness 0.03-0.05 mm; no pits, cracks, or peeling
3 Shaft Run-Out Measurement Each installed shaft checked with dial indicator for radial run-out at bearing journals and roller-mounting sections Bearing journal run-out ≤ 0.02 mm; roller section run-out ≤ 0.03 mm
4 Chain Drive Dry Run Main motor engaged without material load; IBR and corrugated drive chains each run for minimum 30 minutes; visual and thermal inspection Smooth chain movement without binding or skipping; sprocket temperature rise ≤ 15°C above ambient; no abnormal noise
5 Hydraulic System Pressure Test Hydraulic power pack operated; system pressurized to 21 MPa working pressure; hold for 15 minutes; inspect all fittings Zero pressure drop over hold period; zero fluid leakage at any fitting, hose, or cylinder seal
6 IBR Profile Load Test Actual customer-specified PPGI coil (or equivalent) loaded; machine run at 8, 12, and 16 m/min; minimum 10 sheets produced Profile dimensions match drawing within ±0.5 mm; no surface scratches on paint; sheet straightness deviation ≤ 2 mm per meter
7 Corrugated Profile Load Test Same coil material; diverter switched to corrugated path; machine run at 8, 12, and 16 m/min; minimum 10 sheets produced Wave height and pitch match drawing within ±0.3 mm; uniform wave pattern; no coil surface damage
8 Shear Accuracy Verification 10 sheets cut at three different programmed lengths (2.0 m, 3.5 m, 6.0 m); each sheet measured with calibrated steel tape Actual length within ±1.5 mm of programmed value for all 30 test sheets; cut edge square and burr-free
9 PLC Function Check All HMI functions tested: length input, batch count, auto-stop, emergency stop, recipe save/load, language switching, speed adjustment Every function operates as specified; emergency stop halts machine within 0.5 seconds; encoder pulse count verified against measured length
10 Final Visual & Documentation Review Paint finish, weld quality, label affixing, tool kit completeness, document package contents checked against packing list Zero paint defects, weld porosity, or missing labels; all documentation and tools present per packing list

Upon completion of all 10 inspection stages, the machine receives a signed Factory Acceptance Test (FAT) certificate. A copy of this certificate, along with photos of your specific machine during each test stage, is included in the documentation package. Video recordings of the IBR and corrugated profile load tests are saved to the USB drive. You are welcome to visit the factory in person to witness the testing of your machine, or to receive a live video-streamed demonstration upon request.

Facility Preparation — What Your Factory Needs Before the Machine Arrives

Preparation Item Requirement and Guidance
Floor Space Allocation Minimum clear area: 22 meters length × 3.5 meters width (approximately 77 m²). Include additional space at coil-loading end for forklift access and at discharge end for finished sheet stacking and handling. Recommended total dedicated zone: 10 m × 5 m (50 m²) plus material staging area.
Reinforced Concrete Foundation Concrete pad minimum thickness 200 mm, C25 grade or higher, with embedded steel reinforcement mesh. Machine anchor bolt positions per supplied foundation layout drawing. Pad surface must be level within ±3 mm across the full machine footprint. Allow minimum 7 days concrete curing before machine installation.
Electrical Power Supply 3-phase power connection rated for minimum 20 kW total load (11 kW main motor + 4 kW hydraulic + control system + lighting margin). Supply cable terminated in a lockable industrial isolator switch within 5 meters of the planned PLC control cabinet location. Voltage must match machine specification (standard: 380V/50Hz; confirm custom voltage if ordered).
Overhead Crane or Forklift Lifting equipment with minimum 5-ton safe working load for unloading the main machine body from the container and positioning it on the foundation. The main frame weighs approximately 3.5-5.5 tons depending on grade and roller count. Spreader bar and slings rated for the load are required.
Compressed Air (Optional) If pneumatic decoiler expansion or optional automatic stacking arm is ordered: compressed air supply at 0.6-0.8 MPa with minimum 200 L/min flow rate. Air must be filtered and lubricated. 1/2-inch BSP quick-connect coupling at machine location.
Raw Material Inventory At minimum 5-10 tons of PPGI or galvanized coil in the gauge and width required for your target IBR and corrugated profiles. Having test material on-site enables immediate commissioning without waiting for coil delivery after machine installation.
Operator Selection Designate one primary operator before machine arrival. Operator should have basic mechanical aptitude and English literacy sufficient to navigate the HMI touchscreen and read the operation manual. No prior roll forming experience is necessary — all essential skills are covered in the commissioning process.

IBR and Corrugated Sheeting — Commercial Product Specifications for End Customers

Understanding the commercial specifications of the roof sheeting products your machine will produce helps you plan your product catalog, pricing structure, and marketing strategy. The following tables present the standard IBR and corrugated sheeting specifications from the end-customer's perspective — the information your sales team will use to quote projects and write invoices.

IBR Trapezoidal Roof Sheeting — Commercial Product Range (Upper Machine Tier)
Product Code Cover Width Rib Height Ribs / Sheet Standard Lengths Weight per m² (0.4 mm) Typical Retail Market
IBR-686 686 mm 43 mm 5 1.8 – 8.0 m ~4.6 kg South Africa, Botswana, Namibia, Zimbabwe — SANS-compliant residential
IBR-762 762 mm 43 mm 5 2.0 – 10.0 m ~4.1 kg Kenya, Tanzania, Uganda, Yemen — industrial warehouse standard
IBR-840 840 mm 35 mm 4-5 2.0 – 12.0 m ~3.7 kg Nigeria, Ghana, Philippines, Indonesia — commercial and institutional
IBR-925 925 mm 38 mm 5 2.5 – 14.0 m ~3.4 kg UAE, Saudi Arabia, Qatar — large-span factory and hangar roofing
IBR-1050 1050 mm 28 mm 6-7 2.0 – 13.0 m ~3.0 kg Australia, NZ, Pacific — cyclone-rated wall and roof cladding
Corrugated Wave Roof Sheeting — Commercial Product Range (Lower Machine Tier)
Product Code Cover Width Wave Height Waves / Sheet Standard Lengths Weight per m² (0.4 mm) Typical Retail Market
CR-665 665 mm 17 mm 11 1.5 – 6.0 m ~4.7 kg El Salvador, Guatemala, Honduras — agricultural and fencing
CR-715 715 mm 17 mm 11 1.5 – 7.0 m ~4.4 kg Ghana, Burkina Faso, Senegal — rural housing and school projects
CR-762 762 mm 17 mm 12 2.0 – 9.0 m ~4.1 kg Chile, Peru, Bolivia — mining infrastructure and warehouse siding
CR-836 836 mm 17 mm 11 2.0 – 8.0 m ~3.7 kg Kenya, Tanzania, Rwanda — mass housing and humanitarian shelter
CR-990 990 mm 17 mm 13 2.5 – 10.0 m ~3.2 kg Mauritius, Seychelles, Maldives — resort and coastal construction

Machine Technical Data — Engineering Reference

Technical Parameter Specification Data
Machine Type & Configuration Double layer cold roll forming machine; upper carriage: IBR trapezoidal profile; lower carriage: corrugated sinusoidal wave profile; vertically stacked architecture with shared drive and shear
Structural Frame Grade 350H welded H-section structural steel (standard); 400H (heavy-duty option for deep-rib IBR ≥ 43 mm or machine weight > 7 tons)
Side Panel / Wall Plate 16-20 mm CNC laser-cut steel plate; precision-bored bearing housing bores with tolerance H7 for accurate shaft alignment
IBR Roller Stations 14 to 18 rows; each station: one pair hardened chrome rollers mounted on keyed shafts with dual self-aligning bearings
Corrugated Roller Stations 12 to 16 rows; same bearing, shaft, and chrome specification as IBR carriage
Roller Core Material 45# medium-carbon steel forging (equivalent to AISI/SAE 1045); CNC contour-turned to ±0.03 mm profile tolerance
Roller Surface Finish Industrial hard chrome electroplate, 0.03-0.05 mm thickness, HRC 58-62 hardness; mirror-polished forming contact surfaces
Shaft Specification Φ75 mm or Φ80 mm diameter solid alloy steel, centerless precision ground; keyway per GB/T 1095 standard for sprocket mounting
Bearing Type Double-row self-aligning spherical roller bearing (22xxx or 23xxx series); split pillow block housing; Zerk-type grease nipple
Drive Transmission Duplex roller chain, 6-fen (19.05 mm) pitch standard or 1-inch (25.4 mm) pitch heavy-duty; hardened and precision-ground sprockets
Tier Selector Manual lever-operated diverter plate with spring-loaded positive-lock detent; upper position = IBR path, lower = corrugated path
Main Drive Motor 3-phase AC squirrel-cage induction motor; 7.5 kW (standard) or 11 kW (heavy-duty); 4-pole (approx. 1450 rpm at 50 Hz)
Speed Regulation Variable frequency drive (VFD) with digital keypad; 0-50 Hz output range; stepless speed 0-18 m/min; acceleration/deceleration ramp programmable
Gearbox Ratio Cycloidal pinwheel or helical-bevel reduction gearbox; ratio selected to match motor speed to target forming speed range
Hydraulic Power Pack 4.0 kW motor; gear-type pump (8-12 cc/rev displacement); 60-80 L reservoir; air-cooled radiator; pressure gauge 0-40 MPa; relief valve set at 25 MPa
Shear Mechanism Guillotine-type flying post-cut; shear carriage on linear bearing rails with spring-return cylinder; blade set: Cr12MoV die steel
Blade Heat Treatment Vacuum quench 1020-1040°C; triple temper 180-200°C; final hardness HRC 60-62; edge ground to 0.01-0.02 mm sharpness
Length Measurement System Rotary incremental encoder (1000-2500 PPR) on friction measuring wheel; quadrature output to PLC high-speed counter input
Length Accuracy ±1.5 mm at all rated forming speeds; verified by calibrated tape measurement on 30-sample test run per FAT protocol
PLC Controller Platform Siemens SIMATIC S7-200/S7-1200, Delta DVP-SS2/DVP-SE, or Mitsubishi MELSEC FX3U/FX5U series — per customer brand preference
HMI Display 7-inch TFT-LCD color touchscreen; 800×480 pixel resolution; resistive touch (glove-operable); RS-485/RS-232 communication to PLC
Electrical Enclosure Rating IP54 dust and splash-proof control cabinet; forced-ventilation cooling fan with filter; cable entry via bottom gland plates
Acceptable Coil Material PPGI (pre-painted galvanized iron), PPGL (pre-painted galvalume/Zincalume), HDGI (hot-dip galvanized iron), Al-Zn alloy coated (AZ50-AZ150), pre-painted aluminum strip
Material Gauge Range 0.30 mm to 0.80 mm standard; 0.25 mm minimum and 1.00 mm maximum with engineering confirmation
Coil ID / OD Limits Inner diameter: Φ450-520 mm; outer diameter: up to Φ1250 mm maximum; coil width: up to 1250 mm (IBR) / 1250 mm (corrugated)
Decoiler Load Rating 5 metric tons (standard); 8 metric tons (heavy-duty); hydraulic or manual mandrel expansion; loop control sensor for tension regulation
Production Line Dimensions Approximately 18-22 m total length × 2.5 m width × 2.5 m height (varies by frame grade and roller station count)
Machine Net Weight 6.5 to 9.0 metric tons depending on frame grade (350H/400H), roller station count (14-18+12-16), motor power (7.5/11 kW), and optional attachments
Power Supply Standard AC 380V ±10%, 50 Hz, 3-phase + neutral + earth (5-wire); customizable to 220V/440V/480V at 50 or 60 Hz
Profile Changeover Time 5-15 minutes; operational steps: stop machine → move diverter lever → verify strip centering → select recipe on HMI → confirm length → restart
Noise Level ≤ 85 dB(A) at 1 meter from machine at rated forming speed with 0.5 mm PPGI material
Design Service Life ≥ 15 years under normal operating conditions (8-10 hours/day, 250-300 days/year) with recommended preventive maintenance

Warranty Coverage and After-Sales Support Terms

Support Item Coverage Details Duration / Conditions
Comprehensive Machine Warranty Covers all manufacturing defects in materials and workmanship: frame weld failures, roller delamination, shaft breakage, bearing seizure, gearbox failure, motor winding faults, PLC/HMI malfunction, hydraulic pump failure, cylinder seal leakage 12 months from date of shipment (bill of lading date); extended warranty available at additional cost
Wear Parts Coverage Shear blades, drive chains, sprockets, bearings, hydraulic seals, V-belts (if equipped) covered for premature failure attributable to manufacturing defect 6 months from date of shipment; normal wear-and-tear excluded
Remote Technical Support Video-call diagnostics via WhatsApp, WeChat, Zoom, or Skype; technician visually inspects machine status, guides operator through troubleshooting, adjusts PLC parameters remotely if internet-connected HMI option purchased Unlimited during warranty period; available after warranty on per-incident or annual contract basis
Spare Parts Supply All machine components available as spare parts with factory part numbers; express air freight shipment for urgent breakdown parts (2-7 business days worldwide); sea freight for planned maintenance stock orders Lifetime parts availability commitment; prices quoted per inquiry
On-Site Service Technician Factory-trained technician dispatched to customer facility for commissioning, major repair, roller changeover, or profile addition; technician handles airfare, accommodation, meals; customer provides local transportation and translator if needed Available upon request; daily service rate applied; typical dispatch within 14 business days after visa processing
Operator Refresher Training Remote video training session for new operators joining after initial commissioning; covers machine startup/shutdown, profile switching, HMI operation, basic troubleshooting, daily maintenance routine 2 sessions included free within first 12 months; additional sessions available at nominal cost

Maintenance Schedule — Daily, Weekly, Monthly, and Annual Tasks

Frequency Maintenance Task Procedure Estimated Time
Daily Clean roller surfaces and machine bed of metal debris Use compressed air or soft brush to remove zinc and paint particles; wipe rollers with clean dry cloth; inspect for embedded debris 10 minutes
Daily Check hydraulic oil level and temperature Read sight glass on reservoir; oil level between MIN and MAX marks; temperature gauge should not exceed 60°C after 1 hour operation 2 minutes
Weekly Lubricate drive chains Apply chain lubricant spray to both IBR and corrugated drive chains while rotating slowly; wipe excess to prevent dirt accumulation 15 minutes
Weekly Grease all bearing housings Pump lithium-based grease (NLGI #2) through Zerk fittings until fresh grease appears at seal; approximately 3-5 pumps per bearing 20 minutes
Weekly Inspect shear blade edge condition Visually examine both upper and lower blade edges for chips, rounding, or uneven wear; test-cut one sheet and inspect cut quality 10 minutes
Monthly Check and adjust chain tension Measure chain sag at midpoint of longest unsupported span; adjust idler sprocket position if sag exceeds 2% of span length 15 minutes
Monthly Tighten all accessible fasteners Torque-check bearing housing bolts, sprocket set screws, motor mount bolts, guard panel screws; retighten to specification if loosened by vibration 30 minutes
Monthly Verify encoder measurement accuracy Run machine to produce one sheet at 3.0 m programmed length; measure with calibrated tape; adjust encoder pulse-per-meter parameter if deviation exceeds ±1.5 mm 15 minutes
Quarterly Replace hydraulic oil filter element Isolate hydraulic power pack; remove filter housing; replace disposable filter element with OEM-specification equivalent; check housing O-ring and replace if hardened 20 minutes
Annually Complete hydraulic oil change Drain reservoir completely; flush with flushing oil if contaminated; refill with ISO VG 46 hydraulic oil (approximately 60-80 liters); replace suction strainer and return filter 2 hours
Annually Inspect all roller chrome surfaces Examine each roller under good lighting for chrome peeling, pitting, or abnormal wear patterns; measure roller diameter at multiple points with micrometer; record in maintenance log 2 hours
Annually Check electrical connections and insulation Tighten all terminal screws in control cabinet; megohmmeter test motor winding insulation (should exceed 1 MΩ at 500V DC); inspect cable glands for tightness 1 hour

Comparison — What Makes This Machine Different from Lower-Cost Alternatives

Quality Factor Lower-Cost / Entry-Level Machines This Double Layer IBR + Corrugated Machine
Frame Structure Channel steel (C-section) or lighter H-beam; fewer cross ribs; thinner side plates (12-14 mm) 350H/400H H-section steel with full cross-ribbed gusset plates; 16-20 mm CNC laser-cut side plates with precision-bored bearing seats
Roller Material 45# steel without forging; CNC turned only, may skip surface grinding; decorative chrome or thin flash chrome 45# hot-forged billet → CNC turned → surface ground → industrial hard chrome 0.03-0.05 mm → HRC 58-62 verified
Shaft Quality Cold-drawn shaft without grinding; standard bearings without self-alignment; possible undersized diameter Φ75-80 mm solid alloy steel, centerless precision ground; dual-row self-aligning spherical roller bearings throughout
Drive Chain Single-row chain; unhardened sprockets; no idler tensioners; chain stretch within months Duplex roller chain; hardened precision sprockets; adjustable idler tensioners at multiple points; chain sized for peak torque with safety margin
Shear Blades Standard tool steel or even carbon steel; basic heat treatment; rapid edge dulling; burr formation on cuts Cr12MoV / SKD11 die steel; vacuum quenched + triple tempered; HRC 60-62; 500,000+ cuts between sharpening
PLC / Electronics Generic or unbranded controller; monochrome text display; limited functions; no recipe storage Siemens / Delta / Mitsubishi PLC; 7-inch color touchscreen; 50 recipes; fault diagnostics; multi-language; encoder closed-loop
Pre-Delivery Testing Dry run only or minimal test; no load test with actual material; no FAT documentation 10-stage FAT protocol; load test with real coil material at three speeds; documented results with photos and video; FAT certificate issued
Documentation Generic manual; no wiring schematic; no video guide; Chinese language only Printed English manual set + USB with PDFs, CAD drawings, wiring/hydraulic schematics, commissioning video, PLC backup, spare parts catalog
After-Sales Support Minimal or no post-delivery contact; parts difficult to obtain; no remote diagnostics capability 12-month warranty; unlimited remote video support; lifetime spare parts; on-site technician available; operator refresher training included

How to Place an Order — Purchase Process Overview

  1. Profile Confirmation: Specify the exact IBR width (686/762/840/925/1050 mm) and corrugated width (665/715/762/836/990 mm) required for your target market. If unsure, consult with our engineering team for market-specific recommendations based on your country and customer base.
  2. Technical Quotation: Receive a detailed proforma invoice listing every included component, technical specification, delivery timeline, payment terms, and shipping options. Machine configuration is finalized and locked at this stage.
  3. Production Scheduling: Upon deposit confirmation, your machine enters the production queue. Typical manufacturing lead time is 25-35 working days depending on current order volume and configuration complexity.
  4. Factory Acceptance Test: When your machine is complete, the 10-stage FAT is performed. You are invited to witness the test in person or receive live video-streamed demonstration. FAT report with photos and video is sent for your approval.
  5. Final Payment & Packing: After FAT approval and final payment, the machine is disassembled into major sub-assemblies, anti-corrosion coated, packed in ISPM-15 fumigated wooden crates, and loaded into container under your or your freight forwarder's supervision.
  6. Shipping & Documentation: Original bill of lading, commercial invoice, packing list, certificate of origin (if requested), CE certificate copy, and FAT certificate are couriered to you. Digital copies sent by email for customs clearance preparation.
  7. Installation & Commissioning: Upon container arrival at your facility, follow the installation manual and commissioning video. Remote video-call support is available throughout the setup. On-site technician dispatch can be arranged if preferred.
  8. Production Start: Load your test coil, select the recipe on the HMI, and begin producing IBR and corrugated roof sheeting for your customers. Remote support continues throughout the warranty period and beyond.
Online Inquiry